Why Do Many Software Projects Fail
It's not that the code is poorly written—it's that the requirements phase failed to clarify definitions, exceptions, and permissions. For the same “order,” sales, warehouse, and finance often see different statuses; if these aren't defined before development, post-launch will turn into endless field changes.
The Five Phases and Their Deliverables
| Phase | Key Actions | Deliverables |
|---|---|---|
| Requirements Gathering | Interview key roles, draw flowcharts | Flowcharts, data dictionary, requirements sign-off sheet |
| Prototyping | Walk through the main flow by role | Clickable prototype, field list |
| Technical Design | Define module boundaries and interfaces | Architecture overview, database design, milestones |
| Iterative Development | Deliver a usable version every 1–2 weeks | Test environment, change log |
| Launch & Acceptance | Data migration, training, trial run | Source code, deployment docs, acceptance report |
The Three Questions to Ask During the Requirements Phase
- Who can modify this data, and under what conditions? An unclear permission model almost inevitably leads to refactoring later.
- How do exception flows work? Refunds, rejections, backfilled entries, and cross-department transfers take more development effort than normal flows.
- What about legacy data? Historical data often has missing fields or inconsistent definitions; produce a data-cleaning report before migrating.
How to Keep the Budget Under Control
Split the system into Phase 1 and Phase 2. Phase 1 should only include the 2–3 modules “without which the business cannot run”; launch and run for two weeks, then use real usage feedback to decide what Phase 2 covers. This avoids a large one-time investment and helps surface flaws in the process design early.
Don't Just Check Features During Acceptance
Beyond the feature list, also confirm: whether the source code and database scripts are complete, whether the deployment docs allow independent reproduction, whether administrators can actually operate the system, and whether backup and rollback have been rehearsed. Only when you can deploy and modify it yourself is it truly delivered.